Product · PVC / PP · counterflow & crossflow

Cooling tower fills

Surface-enhancing cooling tower fill packs for counterflow and crossflow towers — cut to size, with installation and removal of the old pack.

What the fill pack does

The fill pack is the heart of a wet cooling tower. Its job is to spread the falling hot water across the largest possible surface in the thinnest possible film, so the passing air can carry the heat away. A few cubic metres of fill produce several hundred square metres of water surface: the bulk of the cooling capacity is created here.

It follows that tower performance depends less on the fan or the pump than on whether the fill is intact and clean. Replacing worn fill is therefore the fastest route to recovering cooling capacity.

Counterflow or crossflow?

The first question is always the tower type — the two constructions need different fill geometries, and they are not interchangeable.

In a counterflow tower air travels upward, against the falling water. Dense corrugated film fill is used here: high specific surface delivers the performance, at the cost of greater fouling sensitivity, so it suits clean, filtered systems.

In a crossflow tower air passes horizontally through the falling water. The more open, inclined channel arrangement clogs less readily and works well with gravity water distribution — the more robust choice in dusty environments.

For heavily fouled or very hard water, splash fill is an alternative to classic film fill: wider gaps mean less surface area, but far greater resistance to clogging.

Material: PVC or PP

Most fills are made of PVC: good value, dimensionally stable, smooth surface. Its limit is temperature — above roughly 50–60 °C sustained it loses strength.

For higher inlet water temperatures or more aggressive chemistry, PP (polypropylene) is the right choice: more expensive, but tolerant of considerably higher temperatures and a wider pH range. If your process water runs near the PVC limit, this is a requirement rather than an option.

For outdoor, UV-exposed installations a UV-stabilised version is recommended — the top fill layer and the inlet zone age fastest.

Sizes and installation

Fills are supplied in blocks cut to the tower’s internal dimensions. This is not a formality: air "escapes" through leftover gaps, bypassing the water, and efficiency drops by exactly that much. Accurate sizing needs the tower’s internal dimensions and fill-zone height.

Replacement is best scheduled together with tower cleaning: new fill installed above a sludge-filled basin ends up where the old pack came from within months. Removal and disposal of the old fill is part of the job.

Versions

  • Counterflow film fill — Dense corrugated channels — maximum surface for clean-water systems.
  • Crossflow film fill — Inclined channel arrangement for horizontal airflow, more open structure.
  • Splash fill — Wide-gap grid structure for heavily fouled or very hard water.

Technical data

Material PVC, or PP for higher temperatures
Flow direction counterflow and crossflow versions
Channel spacing typically 12–27 mm, chosen for water quality
Temperature limit PVC approx. 50–60 °C, PP significantly higher
Block size cut to the tower’s internal dimensions
Supply with installation, old pack removed and disposed of

This table is indicative and shows ranges common in the market. The exact type, channel spacing and dimensions are fixed in the quotation, based on your tower’s data.

Frequently asked questions

How do I know whether my tower is counterflow or crossflow?

In a counterflow tower air enters at the bottom and leaves at the top, with the water falling against it. In a crossflow tower air enters through the side wall and passes horizontally through the fill zone. If you are unsure, we clarify it during the survey and quote based on the tower type and fill-zone dimensions.

Can the old fill be cleaned instead of replaced?

No. Deposits crusted into the dense welded channel structure cannot be removed without damaging the sheets, and aged PVC breaks during washing. For worn fill, replacement is the only solution.

How often does fill need replacing?

There is no calendar rule — water quality, filtration and operating hours decide. In practice the signs are rising cold-water temperature, visible deposits, deformed or sagging blocks, and PVC debris appearing in the basin.

Can you supply fill for any tower?

Fills can be fitted to any make, cut to size — we need the tower’s internal dimensions, the fill-zone height and the water characteristics. We record these during the site survey.

Cooling tower fills

Request a quote

Describe the job — we assess it.

Site, equipment, deadline — that is enough to start. We respond on short notice.

Request a quote
Immersive preview ▸